< Previous | Contents | Next >
DR.3.4.1 Electronic Throttle Control (ETC)
a. There is no point penalty for ETC documents.
b. The team will not be allowed to run ETC on their vehicle and must use mechanical throttle operation when:
The ETC Notice of Intent is Not Submitted
The ETC FMEA is Not Submitted, or is not accepted DR.3.4.2 Fuel Type
There is no point penalty for a late fuel type order. Once the deadline has passed, the team will be allocated the basic fuel type.
DR.3.4.3 Program Submissions
Please submit material requested for the Event Program by the published deadlines.
Submission | Refer to: | Required Format: | Submit in File Format: | Penalty Group |
Structural Equivalency Spreadsheet (SES) as applicable to your design | see below | XLSX | Tech | |
ETC - Notice of Intent | see below | ETC | ||
ETC - Failure Modes and Effects Analysis (FMEA) | see below | XLSX | ETC | |
EV – Electrical Systems Officer and Electrical Systems Advisor Form | see below | Tech | ||
EV - Electrical System Form (ESF) | see below | XLSX | Tech | |
EV - Failure Modes and Effects Analysis (FMEA) | see below | XLSX | Tech | |
Presentation (if required, see S.2.4.1) | Present | |||
Cost Report | PDF (1) | Cost | ||
Cost eBOM | XLSX | Cost | ||
Cost Addendum | see below | none | ||
Design Report | Design | |||
Design Spec Sheet | see below | XLSX | Design |
Format: Use the template file or form available on the FSAE Online Website AD.2.2.1
Note (1): Refer to the FSAE Online website for submission requirements
Penalty Group | Penalty Points per Day | Maximum Point Penalty | Not Submitted 10 Days after the Deadline |
Tech | -10 | -50 | |
ETC | |||
Present | -10 | -50 | Removed from Presentation Event Score 0 points in Presentation Event |
Cost | -10 | -80 | Removed from Cost Event Score -100 points in Cost Event |
Design | -10 | -100 | Removed from Design Event Score 0 points in Design Event |