S.3.5 Bill of Materials - BOM

S.3.5.1 The BOM is a list for every vehicle part, showing the relationships between the items.

a. The overall vehicle is broken down into separate Systems

b. Systems are made up of Assemblies

c. Assemblies are made up of Parts

d. Parts consist of Materials, Processes and Fasteners

e. Tooling is associated with each Process that requires production tooling

S.3.5.2 Generate the eBOM file with the BOM data and the Cost Summary from the FSAE Online website

S.3.5.3 Use the format provided and submit the eBOM file as described in section DR - Document Requirements