< Previous | Contents | Next >
S.3.8.1 All costs in the Cost Report must come from the standardized Cost Tables.
S.3.8.2 If a team wishes to use any Parts, Processes or Materials not included in the tables, an Add Item Request must be submitted. See S.3.10