< Previous | Contents | Next >
IN.8.3.1 Inspection Scope
The following items may be confirmed during inspection:
a. Main hoop outer diameter and thickness where it protrudes above the monocoque
b. Main hoop extends to the lowest part of the tub
c. Mechanical attachment of main hoop to tub exists and matches the SES, at all points shown on the SES
d. Front Hoop is installed, visually or by feel and that the mechanical attachment (if included) agrees with the SES
IN.8.3.2 When the Front Hoop is integrally bonded to the monocoque, the size and composition of the Front Hoop must be proven with:
a. Documentation that shows dimensions on the tubes
b. Pictures of the dimensioned tube being included in the layup
IN.8.3.3 For items which cannot be verified by an inspector, the team must provide documentation, visual and/or written, that the requirements have been met.
IN.8.3.4 A team found to be improperly presenting any evidence of the manufacturing process may be barred from competing with a monocoque.